Blast Furnace Control System Upgrade

CSD Engineers was contracted for FEL studies by a major metals client to migrate an obsolete control system to current generation.  This 10,000+ point DCS was a mixture of Westinghouse WDPF and Allen Bradley PLC-5 to control a blast furnace.  Throughout this project the focus was on reusing as much code as possible due to a tight shut-down window, demo of the old system, installation of the new control platform, and commissioning/start-up services.  CSD Engineers provided DCS Programming and PLC Programming for the niche main system integrator. The project successfully deployed an Emerson Ovation control system as the primary DCS, with Allen-Bradley ControlLogix running specific processes throughout the furnace.

  • Location: Pennsylvania
  • Industry: Metals
Back to Project Listing