overdutied breaker

23kV Overdutied Breaker

A major electrical utility contracted CSD Engineers to provide construction engineering services for substation upgrades at multiple locations.  Design services included replacement and installation of the existing 23kV breakers, pre-cast foundations and new control cables.  Special considerations were made regarding layout at several facilities, due to spatial issues with vendor equipment.

  • Location: Pennsylvania
  • Industry: Power Generation